The CBJ has contracted with Michael Baker, Inc. to develop objective criteria for the selection of alternative heliport site)s) within the CBJ. The Scope of Work for this contract is provided here.
The site selection criteria posted here was developed by Michael Baker, Inc. and presented at a public meeting on May 24, 2001.
A public process was conducted in 2000 to assess the feasibility of alternative heliport(s) within the CBJ. The information presented here reflects those efforts.