Hagevig Regional Fire Training Center Renovations, Phase II - Site and Sanitary Sewer Improvements| Project Number: E11-084 | Project Manager: Steve Tada | | Completion Date: July 11, 2011 | Project Manager Telephone: 907-586-0894 | | Contract Amount: $225,832 | Project Manager Email: steve_tada@ci.juneau.ak.us | Contractor: Duran Construction | Project Location Map: No map posted. | | Project Images: No images posted. | Description: The base bid work includes the following: Install E-one packaged sewer plant, 1-1/4" HDPE sewer line to connect to existing sewer service at Sherwood Lane, install duplex pumps with guide rails, floats, electrical controls, ladder and other system features in existing reservoir, install 6-inch CPP drain pipes, catch basins type III, 6-inch gate valve, remove and replace existing asphalt pavement, construction surveying, install oil/water separator, adjust water valves, cap pipes as shown and other miscellaneous items of work. |