City and Borough of Juneau
155 S. Seward Street
Juneau, Alaska 99801
tel. 907-586-5240
fax 907-586-5385
http://www.juneau.org

Engineering Department

Water and Wastewater Rate Study Update

Proposal Due Date 04/18/2013

Type of Solicitation: RFPBid/RFP Number: E13-238
Date Advertised: March 25, 2013Construction Estimate: N/A
Plan Holders List:
  • Current List
  • Cost of Bid Documents: N/A
    Description:
    Prepare an updated cost allocation and rate design study for the CBJ water and Wastewater Utilities (Utility). The study should provide the Utility with the most cost effective manner of collecting revenue, providing a sound rate structure and give financial direction for a ten year period of operation.
    Bid/RFP Documents:
    Click here to register and/or download.
    Addenda and Additional Information:



    RETURN TO LIST

     

    All Engineering Deparment procurement must adhere to the CBJ Purchasing Code - Chapter 53.50

     

     

    CBJ Image