Simpson Avenue Road Extension and Water ImprovementsBid Opening Date 08/13/2010| Type of Solicitation: RFQ | Bid/RFP Number: E11-095 | | Date Advertised: August 6, 2010 | Construction Estimate: $26,081 | | Plan Holders List: Current List | Cost of Bid Documents: | Description: Provide all labor, equipment, materials and perform all work for removal of approximately 35 feet of two inch water pipe and blow off hydrant and the installation/extension of approximately 40 feet of 8" DI water main. Also included is the installation of a new fire hydrant and pad and approximately 12 feet of 18 inch diameter culvert pipe. The pavement will be extended approximately 28 feet and will include sub grade excavation. The slope shall be armored with oversized shot rock slope protection as necessary. | Bid/RFP Documents: Click here to to view documents. | Additional Information:
|
Result | | Low Bidder/Successful Proposer: Admiralty Construction, Inc. | Bid Opening/Proposal Due Date: August 13, 2010 | Bid Amount: $24,210 | Bid/RFP Result Summary: View (PDF) | Award Date: Not Posted | Award Amount: Not Posted | Notice of Award: No Document Posted |
RETURN TO LIST
All Engineering Deparment procurement must adhere to the CBJ Purchasing Code - Chapter 53.50
|