Gold Creek Flume Power WashingBid Opening Date 04/29/2010| Type of Solicitation: RFQ | Bid/RFP Number: E10-261 | | Date Advertised: April 22, 2010 | Construction Estimate: $25,000.00 | | Plan Holders List: Current List | Cost of Bid Documents: N/A | Description: • Remove all extraneous matter such as trash, dirt, gravels, and vegetation, etc. from within the flume.
• Power wash (with water only – no chemicals to be used) the concrete surfaces of the flume walls and floor to remove moss and algae with particular care being taken to not remove the underlying concrete, which may be soft in places.
• Remove vegetation from the joints between concrete wall panels.
| Additional Information:
|
Result | | Low Bidder/Successful Proposer: Silver Bow Construction | Bid Opening/Proposal Due Date: April 29, 2010 | Bid Amount: $15,500.00 | Bid/RFP Result Summary: View (PDF) | Award Date: Not Posted | Award Amount: Not Posted | Notice of Award: No Document Posted |
RETURN TO LIST
All Engineering Deparment procurement must adhere to the CBJ Purchasing Code - Chapter 53.50
|