Engineering Menu
|
Consolidated Public Works Facillity, Phase IIIBid Opening Date 07/22/2011| Type of Solicitation: Bid | Bid/RFP Number: E12-011 | | Date Advertised: July 1, 2011 | Construction Estimate: $1,000,000. | | Plan Holders List: Current List | Cost of Bid Documents: $50.00 | Description: This Project consists of site work at the upper level and to the northerly limits of the overall project, including clearing, excavation to all peat and other organic material down to the wet, silty sands and gravel layer, excavation of the wet, silty sands material as embankment excavation of the gravel embankment overlaying the peat in the former ADOT&PF storage area and use of this material as fill under the future building areas and in a temporary driveway, shot rock borrow, surfacing some areas with base course, and underground storm drainage system, including underdrains and miscellaneous related Work. | Bid/RFP Documents: Click here to to view documents. | Additional Information:
|
Result | | Low Bidder/Successful Proposer: Channel Construction, Inc. | Bid Opening/Proposal Due Date: July 22, 2011 | Bid Amount: $743,393.50 | Bid/RFP Result Summary: View (PDF) | Award Date: Not Posted | Award Amount: Not Posted | Notice of Award: No Document Posted |
RETURN TO LIST
All Engineering Deparment procurement must adhere to the CBJ Purchasing Code - Chapter 53.50
|