Description: This project consists of all work necessary to patch the eroded concrete channel floor of the upper reaches of the Gold Creek Flume and replacement of eroded concrete from between iron protection rails with cement-based metallic-aggregate topping material as shown in the drawings, and other miscellaneous work.