Gold Creek Flume Concrete Patching

Bid Opening Date 03/08/2011

Type of Solicitation: BidBid/RFP Number: E11-205
Date Advertised: February 15, 2011Construction Estimate: $135,000
Plan Holders List:
  • Current List
  • Cost of Bid Documents: $20
    Description:
    This project consists of all work necessary to patch the eroded concrete channel floor of the upper reaches of the Gold Creek Flume and replacement of eroded concrete from between iron protection rails with cement-based metallic-aggregate topping material as shown in the drawings, and other miscellaneous work.
    Bid/RFP Documents:
    Click here to to view documents.
    Additional Information:

    Result

    Low Bidder/Successful Proposer: Henricksen Constructors
    Bid Opening/Proposal Due Date:
    March 8, 2011
    Bid Amount:
    $197,840
    Bid/RFP Result Summary:
    View (PDF)
    Award Date:
    Not Posted
    Award Amount:
    Not Posted
    Notice of Award:
    No Document Posted

    RETURN TO LIST

     