|
Engineering Menu
|
Main Street ImprovementsBid Opening Date 01/26/2010| Type of Solicitation: Bid | Bid/RFP Number: E10-007 | | Date Advertised: December 31, 2009 | Construction Estimate: 1,600,000 | | Plan Holders List: Current List | Cost of Bid Documents: $50.00 | Description: This project consists of replacement of the storm drainage, sanitary sewer and water systems, roadway and sidewalk embankments, curb and gutter, paved street surfacing, new traffic islands, sidewalk pavers, landscaping, a sidewalk canopy, and street lighting, new traffic signalization detector loops. | Additional Information:
|
Result | | Low Bidder/Successful Proposer: Arete Construction Corp. | Bid Opening/Proposal Due Date: January 26, 2010 | Bid Amount: $1,779,285.00 | Bid/RFP Result Summary: View (PDF) | Award Date: Not Posted | Award Amount: Not Posted | Notice of Award: No Document Posted |
RETURN TO LIST
All Engineering Deparment procurement must adhere to the CBJ Purchasing Code - Chapter 53.50
|