Pioneer Avenue Reconstruction, Phase III

Project Number: E14-022Project Manager: John Nelson
Completion Date: September 15, 2013Project Manager Telephone: 907-586-0896
Contract Amount: $1,034,925.00Project Manager Email: john_nelson@ci.juneau.ak.us
Contractor:
Arete Construction Corp.
Project Location Map: No map posted.
Project Images: No images posted.
Description:
This Project consists of reconstruction of Pioneer Avenue from No. 3151 Pioneer Avenue through the Blueberry Hills Road intersection, the installation of an 8-inch, 10-inch and 16-inch HDPE pipe along Pioneer Avenue and into the Blueberry Hills Road intersection, a temporary 6-inch HDPE water pipe by-pass system, new underground storm drainage and replacement of the street and the right side sidewalk embankments to a 24-inch depth, new asphalt pavement, concrete sidewalks, and curb and gutter