CDD Home Page
----------------------------
CDD Enforcement Page
----------------------------
Permit Center Page
----------------------------
Forms, Reports and Handouts
----------------------------
Codes, Laws and Regulations
----------------------------
Maps and Drawings
----------------------------
Plans and Studies
----------------------------
Staff Directory
----------------------------
Planning Commission Page
----------------------------
Historic Preservation Page
----------------------------
Historic Preservation Database
----------------------------
Contact Us
----------------------------
Douglas Highway Corridor Traffic Study, September 15, 1996 Final Report
Prepared by Parsons Brinckerhoff Quade and Douglas, 999 3rd Avenue Suite 2200, Seattle, WA 98104
Title Page
,
Table of Contents
,
Acknowledgements
.
Introduction
Purpose of the Study
Study Areas
Study Process
Existing Conditions
Data Collection
General Character of Study Area
Roadway Characteristics
Transit Service
Pedestrian Travel
Bicycle Travel
Safety/Accident History
Traffic Volumes and Operation
Other Concerns
Summer of Existing Conditions
Future Conditions
Forecasting Process and Assumptions
Near-Term Future (5 Year Forecast)
Mid-Range Future (10 Year Forecast)
Current Comprehensive Plan
With Goldebetl Development (Phase 1)
Long-Range Future (20 Year Forecast)
Current Comprehensive Plan
With Goldbelt Development (Half of Phase 2)
Summary of Expected Traffic and Future Corridor Operation
Summary of Existing and Future Corridor Needs
Traffic Improvement Treatments
Development of Treatments
Transportation System Management (TSM) Treatments
Travel Demand Management (TDm) Treatments
Capital Treatments
Evaluation of Treatments
Conclusions and Recommendations for Douglas Highway
Appendices
Appendix A: Public Meetings and COmments
Appendix B: Bibliography
Appendix C: Examples
Appendix D: Glossary of Technical Terms.
home
city links
state links
community
visitors
images
business
jobs
calendar
search